Pre-construction Checklist
Resolve the fireplace opening, services and access before the wall is closed.
Use this checklist during concept design, technical coordination and pre-installation review. The supplied manual and approved drawing remain the controlling documents for the exact appliance.

Prepared bySEFIRE Editorial Team
Technical reviewSEFIRE Technical Team
Last reviewedJuly 14, 2026
Installing a mist fireplace? Use the detailed water vapor fireplace installation guide for the power, water, drainage, airflow, commissioning, and handover sequence.
Design Freeze
Product and opening.
- Record exact product family, model, finish and viewing direction.
- Obtain the current model drawing before finalizing the opening.
- Coordinate appliance body, finished opening, support and decorative surround as separate dimensions.
- Confirm whether the installation is single-sided, see-through, corner, bay or vertical.
- Provide a route for removal, inspection, filling and routine service.
Site Services
Power, controls, water and drainage.
- Confirm destination voltage, frequency, outlet location and isolation method.
- Confirm the supplied control package and any network or smart-home interface.
- For water vapor units, identify manual fill or automatic water connection.
- For automatic water systems, coordinate water quality, valve, drain route and leak-management approach.
- Keep cables, hoses, connectors and service components accessible after finishes are complete.
Construction
Support, materials and environment.
- Design stable level support for the appliance and firebox.
- Confirm surrounding material requirements and clearances from the current manual.
- Coordinate room ventilation and appliance airflow openings where required.
- Review nearby curtains, furniture, circulation routes, televisions and heat-sensitive finishes.
- For outdoor products, review weather exposure, wind, drainage, electrical protection and seasonal storage.
Handover
Evidence before operation.
- Check model and order configuration against the received unit.
- Retain manual, drawing, product identification and applicable certificates.
- Complete agreed functional checks before closing access panels.
- Train the responsible operator in filling, starting, stopping, cleaning and abnormal-condition response.
- Record service access and contact information for future maintenance.
Local review: the project architect, contractor and installer must apply destination-specific building, fire, electrical and ventilation requirements. A generic website checklist cannot approve a site.