Project Brief
Give technical sales enough information to recommend a usable configuration.
A product photo and target length are not enough for a reliable fireplace proposal. Complete the fields below and attach the latest plan, elevation or wall section.

Prepared bySEFIRE Editorial Team
Technical reviewSEFIRE Technical Team
Last reviewedJuly 14, 2026
Copy This Structure
Project identification and commercial scope.
Company and contactName, role, email, telephone
Project locationCountry, city and destination market
Project typeHome, villa, hotel, restaurant, retail, showroom or distribution
QuantitySample, project quantity and forecast volume
Target dateSample deadline and required shipment date
Trade termsRequired quotation basis and destination port if known
Product Requirement
Define the appliance and visual objective.
Product familyRCFB Regular, RCFB Slim, SEV, Round, Primary, Deluxe, Manual or Firebox
Target sizeFinished opening and desired flame length
Viewing formatSingle, see-through, corner, bay, freestanding or vertical
FinishBlack, silver or custom requirement
ControlsButton, remote, app or integration requirement
Operating priorityReal flame, no combustion, shallow depth, automation or no electricity
Site and Documents
Describe what the building can support.
ElectricalVoltage, frequency and planned supply point
Water and drainAvailability and route for vapor models
Wall constructionSection, support, materials and service access
EnvironmentIndoor/outdoor, room use and nearby finishes
Required evidenceDrawing, manual, certificate scope, inspection photos or video
AttachmentsPlan, elevation, wall section, reference image and marked dimensions
Better inquiries receive better answers: SEFIRE should not guess missing opening dimensions, destination voltage, water arrangement or control requirements.