Define the fire effect
Choose real flame, smart ethanol vapor, combustion-free water vapor or a manual burner based on the site and operating objective.
Project Planning
SEFIRE supports builders, designers, distributors and fit-out teams with product-family selection, dimensions, controls, installation questions, samples and export preparation. This page explains the evidence required before an installation is presented as a case study.

Publication rule: application images illustrate installation formats unless the model, project context and source evidence have been documented.
SEFIRE does not invent customer names, locations, performance results or testimonials.
Project Path
Choose real flame, smart ethanol vapor, combustion-free water vapor or a manual burner based on the site and operating objective.
Share wall sections, finished opening, viewing sides, materials, services and maintenance access before the enclosure is fixed.
Record model, size, finish, voltage, controls, water arrangement where applicable, quantity and destination.
Use quotation, drawing, sample decision and agreed packing or inspection requirements as the production baseline.
Case Evidence Standard
Current status: visual references on this website are not automatically claimed as named customer case studies. Full case pages will be published only when the evidence above is available.
Start Correctly
Include country, room or venue type, target visual opening, proposed product family, viewing sides, finish, quantity, voltage, control preference, water and drain availability where relevant, target date and the latest wall drawing.