Technical Data Policy

How SEFIRE qualifies product information and resolves conflicts.

This policy explains the hierarchy, review boundary and correction path used for technical content on Shineflame.com. Its purpose is to prevent a website summary from being mistaken for a project-specific approval.

Fireplace technical drawings, model reference and material samples under review

Owner: SEFIRE Editorial Team. Technical review: SEFIRE Technical Team.

Effective and last reviewed July 14, 2026. Correction requests: sales@sefireplace.com.

Document Hierarchy

When values conflict, use the most specific approved document.

1. Signed quotation and approved project drawing

These define the commercial and project-specific configuration accepted for production.

2. Delivered manual and product nameplate

These identify the supplied appliance and operating information. Use the edition delivered with the product.

3. Current model catalog or technical sheet

These support selection but may cover options that are not included in a particular order.

4. Website summary

Web pages help discovery and early comparison. They have the lowest authority when a more specific approved document exists.

Source Labels

How statements should be interpreted.

Verified model data means values were checked against an identified current internal product dataset or technical document. Project guidance means practical planning advice that still requires confirmation for the exact installation. Catalog capability describes a possible option, not an automatic inclusion in every order.

Website pages do not make universal promises about certification, IP rating, clearances, minimum order quantity, lead time, warranty, platform compatibility or local approval unless the exact scope and source are stated.

Corrections

A visible process for technical corrections.

  1. Send the page URL, disputed statement and supporting drawing, manual, catalog or product label to sales@sefireplace.com.
  2. The editorial team checks the published wording and the technical team reviews the product source.
  3. If correction is required, the page and its review date are updated.
  4. Project-specific conflicts are resolved through the approved order documents, not by silently changing an unrelated web page.

Safety and compliance: installers and specifiers remain responsible for applicable local building, fire, electrical and ventilation requirements. SEFIRE should be asked for exact model documents before construction.